On the weather front, it was just another dull and rainy January morning and the prospects didn’t look too bright either. Nevertheless, there were advances on several fronts.
The footbridge lamp standards got a second coat of ‘County Cream’.
More rationalisation of the stores was in evidence.
The hole on the pub wall was filled with a strong mortar mix, which will hopefully solve the damp wall at the rear entrance.
Under the heading of good housekeeping, the pub door onto the platform was rubbed down and painted in its first top coat.
The timetable boards were black painted. The shop window frames were washed down and reputtied ready for painting next week. A strip light cover was replaced in the ladies room. The canopy lights were wiped clean.
Following these small but important jobs, the workshop was left in the hands of those responsible for the current reorganisation.
The tent was rearranged to allow better access for the bench refurbishment operations.