WWCC Sat 13 Jan

Another good turnout this weekend, our immediate attention was focussed on the new handrails for the footbridge. After slight modifications all three remaining handrails have now been trial fitted, and once the final top coat of black gloss has dried will be ready for final fixing.

The workshop is still in a state of flux as the final positioning of the rearranged facilities is still being organised. Some housekeeping was done outside around our compound and the skip area.  Inside, the floor was swept and the debris removed.  We have locally purchased a metal clad double switched socket, which will be hard wired in to replace an inadequate extension lead supplying the radiator.

IMG_6121Further paint treatments were applied to the Booking Office doors out on to the platform.