The Wailing Wall Construction Company has tackled many jobs in its time, big and small. One of the more strenuous tasks is digging holes, and this was needed last month in preparation for the new ANPR parking control system that goes live after tomorrow.

The signs have to be mounted at very precise points and heights – all laid down in the planning consent (needed because of us being in the conservation area). Reusing rail lengths makes for very sturdy and appropriate posts. In this case they were cut by the PWay team to 3 yards apiece, and we needed five of them, weighing in at about 270lbs each.

To meet the specification, holes had to be dug 2ft6in deep, to support the height of the signs, and in the positions where there was no existing structure to fix to.

post in hole, concrete ready
next post on rollers
once more with feeling…
final post concreted in place

Availability of the rail meant we had no time to paint it before installing, which would have been much easier. Fortunately the weather was kind and the black gloss was quickly applied.

Andy painting the sign 3 post
sign 5 on a painted post
sign 1 with payment machine against cleaning cupboard
signage and lower payment machine
sign 4 against the signal box

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: