On the level

IMG_2484

On our Tuesday #WailingWall session, Trevor our latest recruit was given a whistle stop tour of the Loco Dept. followed by helping Chris on a small woodworking job in connection with the Christmas lights. Tim tackled the three recently Nitromors treated bench supports, which were cleaned down and then coated in Red Oxide primer, they were then returned to the tent to await undercoating at the weekend. Robin, Peter, Steve and Pete were engaged on cutting and fitting the non-slip plywood onto the four new sleepers on the main running side of the level crossing. After lunch, a start was made in shaping the next sleeper to be placed in the six foot section of the crossing.