Wailing Wall update

IMG_7226

Wailing Wall team members have been busy as ever.

IMG_7222

IMG_7216

Robin, Arthur and Dave, rebuilding the car park full sign

IMG_7229

IMG_7230

IMG_7231

Mike in the tent where our benches get rebuilt and refurbished

IMG_1369

IMG_1373

IMG_1374

IMG_1379

IMG_1384

A team effort to get the newly cast lamp standard over to platform 2 north end

IMG_7227

A new roof on the signal box wood store

 

 

Advertisements

Services room

IMG_7180

The services room, created by combining the former disabled access toilet and the adjacent staff shower, is being fitted out by our skilled volunteers in the IT/Telecoms Dept.

IMG_7185

IMG_7182

IMG_7183

IMG_7181

IMG_7179

The transfer of power supply on Wednesday went smoothly in a Western Power outage carefully planned and managed by the electrical contractor and our own stationmaster who happens to be a chartered engineer. The loss of power, originally intended to be from 10am to 2pm, in fact was started at 6am and completed within 2.5 hours, thus totally avoiding any disruption to our commercial service on the day. A great job!

 

Pictures outside

IMG_7175

It’s easier to show than describe, so here are the pictures to speak a thousand words.

IMG_7176

Views from the town footbridge.

IMG_7173

Views from the car park side of the current bar, showing the toilet areas.

IMG_7174

Views towards the service yard.

IMG_7172

IMG_7169

The passageway between the main building and the new build.

IMG_7168

Looking south along the platform.

IMG_7165

Looking toward the south aspect, with the door onto the terrace.

 

 

 

Unwrapping

In recent days we’ve been getting a better impression of how the south end of our station will look when the new build is complete.

IMG_7055

The scaffolding removal from most of the structure has unwrapped the view and better shown the handsome brickwork and design features previously hidden.

IMG_7027

The floor has been screeded following the laying of underfloor heating.

IMG_7002

First fix of mechanical and electrical works is underway.

IMG_7031

 

The new services room created by combining the former disabled toilet and adjacent volunteers shower, our IT/Telecom volunteer team have commenced the installation of a large amount of impressive hardware.

IMG_7038

On Wednesday Western Power Distribution will be transferring us on to the new power supply, through the cables laid by the contractor, and terminating the existing inadequate supply. For a few hours early in the morning we will be without power while this is carried out, but effort is being made to minimise the disruption by close liaison between our stationmaster (handily qualified in HV power) and the contractors.

IMG_7056

It has been nice to hear admiring comments from visitors and passengers alike as the oh-so long awaited new facility is getting nearer to handover.

IMG_7040

Inevitably our much loved station has been swathed in builders supplies and waste, and we’ve had to coax our existing facilities into keeping going for just a few weeks and months more, patching up and making do as best we can.