WWCC Tues 23 Jan

Another grey day, but at least we had another good turnout.  Today’s main effort, involved finally getting the three remaining footbridge handrails in place, this was successfully completed and the footbridge left open to visitors.

IMG_6211

IMG_6215

IMG_6214

The two Platform 2 extension markers were hammered into the ballast at the appropriate distance from the south end.  Elsewhere, we were made aware of a problem involving the DPM under the rear edge of the slates on the Plat 2 shelter, which was flapping in the breeze.  Approximately 12 feet of the material had to be repositioned under the edge of the slates, using ladders from the Loco Dept.

Finally, back in the shed. both footbridge lamp standards were rewired in the correct cable onto new lamp holders, the refurbished lampshades were given a coat of green paint on the outside, approximately the same colour as the original green enamel.

IMG_6221

IMG_6219

IMG_6220

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s