Town footbridge temporary fix

So the temporary fix is being tried out, with the rather heavy weight positioned to hold the bridge down into place while new fixings are installed. Hopefully the bridge walkway will stay down when those weights are removed!

IMG_6203

IMG_6205

Eight holding down bolts fix the deck walkway in position and prevent it from moving excessively under live pedestrian loading. It’s believed the bolt failure has been caused by a combination of

– de-icing salts which have penetrated onto the tops of the bank supports and ‘eaten’ away at the high tensile steel bolts

– cyclic fatigue failure due to pedestrian live loading

– contraction of the main cables and lattice steelwork caused by the recent prolonged cold temperatures.

It is thought the problem has built up over a number of years but remained hidden from view due to the design detailing.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s